The project seeks approvals to enable the ongoing operation and maintenance of the existing Coleridge Hydro-electric Power Scheme (HEPS), located around Lake Coleridge in the Selwyn District, Canterbury.
The scheme utilises Lake Coleridge and associated water diversion, storage and conveyance infrastructure to generate electricity, including water takes and diversions from the Wilberforce, Harper and Acheron Rivers, canals, tunnels, penstocks, a power station, and a tailrace discharging to the Rakaia River. The project seeks approvals to enable the continued operation and maintenance of this existing infrastructure and any associated works and activities required for the operation and maintenance of the scheme.
The applicant seeks the following approvals, subject to further investigations prior to any substantive application:
The project area is located at and around Lake Coleridge, which is within the Rakaia River catchment, in the Selwyn District of the Canterbury Region. Lake Coleridge is located approximately 100 kilometres west of Christchurch City.
The Minister for Infrastructure referred the project to the Fast-track on 16 October 2026. The application was lodged on 20 August 2026.