Project summary
Upgrade the HVDC inter-island transmission link connecting the North Island and the South Island, including—
installing new cables
constructing new or extended cable termination stations at Oteranga Bay and Ōraumoa/Fighting Bay sites
relocating existing transmission lines to connect to the termination stations
Project location
In the Cook Strait, generally in the area subject to the Cook Strait Cable Protection Zone, Oteranga Bay, Ōraumoa / Fighting Bay, Hakana Bay, Ōpua Bay, and land under the BEN-HAY A line.