- Listed
- Applied
- Comments
- Panel considering
- Decision
Project summary
Reconsent Manawa Energy Limited's existing Kaimai Hydroelectric Power Scheme, including increasing residual river flows, providing fish passage, and implementing a sediment management plan.
Project location
Within the Kaimai Ranges and the Wairoa River Catchment, 12 kilometres southwest of Tauranga and 25 kilometres northwest of Rotorua.
Project listing application
Kaimai Hydro-Electric Power Scheme Re-Consenting application – Ministry for the Environment website
Completeness decision
The substantive application by Manawa Energy Limited was deemed complete on 16 October 2025. The application complies with the requirements of section 46 (2) of the Fast-track Approvals Act 2024. The application was lodged on 29 September 2025.
Competing applications decision
The substantive application by Manawa Energy Limited was deemed to not have any competing applications or existing resource consents on 28 October 2025. This decision is required under section 47 of the Fast-track Approvals Act 2024.
The application has now been referred to the panel convener for determination by a panel.
-
Substantive application
The substantive application documents for the Kaimai Hydro-Electric Power Scheme Re-Consenting project.