Project summary

The project is to renew the consents for the existing Kuratau Hydro-Electric Power scheme approximately 36km south-west of Taupō and approximately 2.5km north-west of Kuratau Village. The Scheme has an installed generation capacity of 6MW and generates on average 28GWh per year and currently generates renewable electricity by:

  • damming of the Kuratau River with an earth dam to form Lake Kuratau

  • the discharge of water from the Kuratau spillway to the Kuratau River

  • the take and use of water and discharge of contaminants from the canal to land

  • the discharge of water from the Kuratau power station turbines to the Kuratau River by means of a tailrace.

Project location

In the Kuratau River catchment approximately 36km southwest of Taupō and approximately 2.5km north-west of Kuratau Village.

Project referral

The Minister for Infrastructure referred the project to the Fast-track on 21 October 2025. The application was lodged on 3 June 2025.

Notice of decisions on application for referral of the Kuratau Hydro Electric Power scheme Project (PDF, 200KB)

  • Referral application

    Referral application documents for the Kuratau Hydro-Electric Power Scheme project.
    Referral application