• Listed
  • Applied
  • Comments
  • Panel considering
  • Decision

Project summary

Construct and operate approximately 44 additional wind turbines, and connect and supply electricity to the national grid.

Project location

Near Eldorado Track (connecting to Mahinerangi Road), 50 kilometres west of Dunedin and 5 kilometres north of Lake Mahinerangi.

Project listing application

Mahinerangi Wind Farm application – Ministry for the Environment website

Completeness decision

The substantive application by Mercury NZ Limited was deemed complete on 27 November 2025. The application complies with the requirements of section 46 (2) of the Fast-track Approvals Act 2024. The application was lodged on 6 November 2025. 

Record of decision on completeness and scope – Mahinerangi Wind Farm substantive application (PDF, 118KB)

Memorandum on completeness and scope – Mahinerangi Wind Farm substantive application (PDF, 750KB)

Competing applications decision

The substantive application by Mercury NZ Limited was deemed to not have any competing applications or existing resource consents on 11 December 2025. This decision is required under section 47 of the Fast-track Approvals Act 2024. 

Record of competing applications - Mahinerangi Wind Farm Project substantive application (PDF, 80KB)

The application has now been referred to the panel convener for determination by a panel.

Decision of appointment of panel and timing of panel decisions

On 5 February 2026, the panel convener issued a minute regarding:

  • the appointment of the expert panel

  • the timeframe for panel decisions for the Mahinerangi Wind Farm project under clause 2 of section 79 of the Act.

The minute can be viewed on the Correspondence page for the Mahinerangi Wind Farm project.

  • Substantive application

    The application documents for the Mahinerangi Wind Farm project.
    Substantive application
  • Correspondence

    Minutes, directions and other correspondence to and from the panel convener and expert panel regarding the Mahinerangi Wind Farm project.
    Correspondence
  • Reports and advice

    Read reports, advice and further information sought in relation to the Mahinerangi Wind Farm project.
    Reports and advice
  • Conferences, workshops and hearings

    Watch and learn more about conferences, workshops and hearings for the Mahinerangi Wind Farm project.
    Conferences, workshops and hearings