- Referred
- Applied
- Comments
- Panel considering
- Decision
Project summary
An infrastructure development upgrade of the transport corridor (approximately 7 kilometres). The project area is Mill Road (linear) corridor – between the Redoubt Road interchange on SH1 in Manukau to the Phillip Road intersection with Mill Road in Takanini, Auckland.
Project location
Mill Road (linear) corridor – between the Redoubt Road interchange on SH1 in Manukau to the Phillip Road intersection with Mill Road in Takanini, Auckland.
Project referral
The Minister for Infrastructure referred the project to the Fast-track on 11 November 2025. The application was lodged on 15 July 2025.
Notice of decisions on application for referral of the Mill Road – Stage 1 project (PDF, 200 KB)
Completeness decision
The substantive application by New Zealand Transport Agency Waka Kotahi was deemed complete on the 23 October 2026. The application complies with the requirements of section 46 (2) of the Fast-track Approvals Act 2024. This application was lodged on 21 September 2026.
Memorandum on completeness and scope – Mill Road – Stage 1 substantive application (PDF, 1.3 MB)
-
Referral application
Referral application documents for the Mill Road – Stage 1 project. -
Substantive application
Substantive application documents for the Mill Road – Stage 1 project. -
Reports and advice
Read reports, advice and further information sought in relation to the Mill Road – Stage 1 project. -
Correspondence
Minutes, directions and other correspondence to and from the panel convener and expert panel regarding the Mill Road – Stage 1 project.