Info: Fast-track team offline 25 December 2025 to 4 January 2026
The application portal and this website remain available.

  • Listed
  • Applied
  • Comments
  • Panel considering
  • Decision

Project summary

Replace the existing one-way bridge and footpath bridge with a new two-lane bridge with a shared path.

Project location

Pepe Stream Bridge, Tairua.

Project listing application

State Highway 25 Pepe Stream Bridge Replacement application – Ministry for the Environment website