Info: Fast-track team offline 25 December 2025 to 4 January 2026
The application portal and this website remain available.
- Listed
- Applied
- Comments
- Panel considering
- Decision
Project summary
Replace the existing one-way bridge and footpath bridge with a new two-lane bridge with a shared path.
Project location
Pepe Stream Bridge, Tairua.
Project listing application
State Highway 25 Pepe Stream Bridge Replacement application – Ministry for the Environment website