Info: Fast-track team offline 25 December 2025 to 4 January 2026
The contact centre closes at midday on 24 December. The application portal and this website remain available throughout the break.

  • Listed
  • Applied
  • Comments
  • Panel considering
  • Decision

Project summary

Establish disposal sites for the deposit of excavated material from Te Rāhui Herenga Waka Whakatāne: Whakatāne Boat Harbour project site.

Project location

  • 1 Kope Drain Road, Awakeri.

  • 44 Keepa Road, Whakatāne (Site 1).

  • 304 Tahuna Road, Te Teko (Site 2).

  • 1257 State Highway 2, Waimana (Site 3).

Project listing application

Te Rāhui Land Fill application – Ministry for the Environment website