Project summary

Three distinct buildings, described as:

  • The Marina Building: 8 storeys (approximately 31 metres in height) including 18 three-bedroom residential apartments.

  • The Tower Building: 23 storeys (approximately 80 metres in height) including 125 residential apartments.

  • The Beaumont Building: 10 storeys (approximately 37 metres in height), including 72 residential apartments, with the option for use as serviced apartments (visitor accommodation).

Additional components, including:

  • Approximately 550m² of ground-level retail space.

  • Vehicle access to the development provided via Beaumont Street only

  • Provision for 273 car parking spaces, primarily serving residential uses.

  • Approximately 152 bicycle parking spaces.

  • Internal connectivity with the adjacent Orams Marine facility.

Project location

188 Beaumont Street, Auckland CBD

Project referral

The Minister for Infrastructure referred the project to the Fast-track on 18 December 2025. The application was lodged on 4 September 2025.

188 Beaumont Street - Notice of Decision letter (PDF, 243KB)

Completeness decision

The substantive application by Westhaven Residential Limited Partnership was deemed complete on 28 April 2026. The application complies with the requirements of section 46 (2) of the Fast-track Approvals Act 2024. The application was lodged on 2 April 2026. 

Record of decision on completeness and scope – 188 Beaumont Street substantive application (PDF, 79 KB)

Memorandum on completeness and scope – 188 Beaumont Street substantive application (PDF, 543 KB)

Competing applications decision

The substantive application by Westhaven Residential Limited Partnership was deemed to not have any competing applications or existing resource consents on 12 May 2026. This decision is required under section 47 of the Fast-track Approvals Act 2024.

Record of decision on competing applications − 188 Beaumont Street substantive application (PDF, 91KB)

Decision of appointment of panel and timing of panel decisions

On 8 June 2026, the panel convener issued Minute 2 covering:

  • the appointment of the expert panel

  • the timeframe for panel decisions for the 188 Beaumont Street project under clause 2 of section 79 of the Act.

The minute can be viewed on the Correspondence page for the 188 Beaumont Street project.

Correspondence

  • Referral application

    The referral application documents for the 188 Beaumont Street project.
    Read more
  • Substantive application

    The substantive application documents for the 188 Beaumont Street project.
    Read more
  • Expert panel

    Information about the expert panel appointed to consider and decide the 188 Beaumont Street project.
    Read more
  • Correspondence

    Minutes, directions and other correspondence to and from the panel convener and expert panel regarding the 188 Beaumont Street project.
    Read more
  • Conferences, workshops and hearings

    Watch and learn more about conferences, workshops and hearings in relation to the 188 Beaumont Street project.
    Read more
  • Comments from invited parties

    The expert panel invites written comments on the application from the persons or groups set out in section 53(2) of the Fast-track Approvals Act 2024.
    Read more