Project summary

A 300-megawatt alternating current (MWac) solar farm with co-located battery energy storage, expected to generate the equivalent electricity to power approximately 70,000 households annually.

Project location

21 km south-east of Tekapo in the Canterbury Region.

Project referral

The Minister for Infrastructure referred the project to the Fast-track on 14 May 2025. The application was lodged on 11 February 2025.