Info: Fast-track team offline 25 December 2025 to 4 January 2026
The contact centre closes at midday on 24 December. The application portal and this website remain available throughout the break.

Tekapo Power Scheme project overview briefing 24 July 2025

On the 24 July 2025, the Tekapo Power Scheme expert panel held a briefing with the applicant and other participants for the Tekapo Power Scheme project. Minute 2 of the expert panel records the briefing.

Minute 2 of the expert panel (PDF, 682KB)

View the presentation by the applicant Genesis Energy Limited:

Project overview conference slides - Tekapo Power Scheme (PDF, 2.23MB)

The applicant also provided further context to the conference discussion and a legal submission for the project overview conference.

Appendix 5 - Memo from K Hughey dated 18 July 2025 (PDF, 595KB)

Appendix 4 - Freshwater and native fish discussion (30 June 2025) record (PDF, 270KB)

Appendix 3 - Avifauna discussion (27 June 2025) record (PDF, 71KB)

Appendix 2 - Groundwater and hydrology discussion (26 June 2025) Record (PDF, 107KB)

Legal submissions for Genesis Energy Limited for the project overview conference - 22 July 2025 (PDF, 381KB)

Panel Convener conference - 13 June 2025

On 13 June 2025, the panel convener conference was held with participants for the Tekapo Power Scheme project.

A recording of the panel convener conference that was held for the Tekapo Power Scheme Fast-track project.