Invitation for comments
On 14 July 2025 , the Drury Metropolitan Centre – Consolidated Stages 1 and 2 expert panel released Minute 1 recording their decision on the parties to be invited to comment.
Minute 1 of the panel (PDF. 195KB)
The closing date for comments was 11 August 2025.
Comments received
Auckland Council comments
Auckland Council comments comprise:
Funding and financing memo (Annexure 1) (PDF, 337KB)
Economic assessment memo (Annexure 2) (PDF, 280KB)
Auckland Transport (Annexure 3) (PDF, 1.72MB)
Traffic engineering memo (Annexure 4) (PDF, 343KB)
Development engineering memo (Annexure 5) (PDF, 221KB)
Watercare memo (Annexure 6) (PDF, 248KB)
Healthy water memo (Annexure 7) (PDF, 2.08MB)
Stormwater (Regional Discharge Permit) memo (Annexure 8) (PDF, 248KB)
Parks planning memo (Annexure 9a) (PDF, 664KB)
Parks planning Sub conditions (Annexure 9b) (PDF, 620KB)
Ecology memo (Annexure 10) (PDF, 250KB)
Regional Earthworks memo (Annexure 11) (PDF, 243KB)
Contaminated land memo ((Annexure 12) (PDF, 343KB)
Noise and vibration memo (Annexure 13) (PDF, 215KB)
Urban design memo (Annexure 14) (PDF, 5.5MB)
Landscape memo (Annexure 15) (PDF, 279KB)
Historic Heritage & Archaeology memo (Annexure 16) (PDF, 514KB)
Franklin Local Board feedback (Annexure 17) (PDF, 183KB)
Other comments received
Associate Minister of Transport (PDF, 43.3KB)
Director-General of Conservation (PDF, 519KB)
New Zealand Transport Agency Waka Kotahi (NZTA) (PDF, 209KB)
Ngāi Tai ki Tāmaki (PDF, 104KB)
Papakura Local Board (PDF, 203KB)
Te Ākitai Waiohua Settlement Trust (PDF, 246KB)
Applicant's response to comments received
Memorandum of counsel response to comment (PDF, 213KB)
Kiwi Property response to comments table (PDF, 7.2MB)
- Attachment 1 - March 2025 Hui minutes (PDF, 161 KB)
- Attachment 2 - Proposed Draft Consent Conditions (PDF, 1 MB)
- Attachment 3 - Traffic Response (PDF, 2 MB)
- Attachment 4 - Traffic Peer Review (PDF, 168 KB)
- Attachment 5 - Revised Architectural Plans (PDF, 20 MB)
- Attachment 6 - Revised Landscape Concept Plans (PDF, 12 MB)
- Attachment 7 - Revised Engineering Drawings_Part1 (PDF, 40 MB)
- Attachment 7 - Revised Engineering Drawings_Part2 (PDF, 39 MB)
- Attachment 7 - Revised Engineering Drawings_Part3 (PDF, 40 MB)
- Attachment 7 - Revised Engineering Drawings_Part4 (PDF, 9 MB)
- Attachment 9 - Response to Council Conditions (PDF, 852 KB)
- Attachment 10 - Kiwi Property Response to Funding and Financing Memo (PDF, 785 KB)
- Attachment 11 - Economics Response (PDF, 241 KB)
- Attachment 12 - Stormwater Response (PDF, 4 MB)
- Attachment 13 - Drury Centre Stage 2 Stormwater Assessment V5_Part1 (PDF, 39 MB)
- Attachment 13 - Drury Centre Stage 2 Stormwater Assessment V5_Part2 (PDF, 40 MB)
- Attachment 13 - Drury Centre Stage 2 Stormwater Assessment V5_Part3 (PDF, 1 MB)
- Attachment 14 - Acoustic Response (PDF, 207 KB)
- Attachment 15 - Key Plans Package (PDF, 9 MB)