Info: Fast-track team offline 25 December 2025 to 4 January 2026
The contact centre closes at midday on 24 December. The application portal and this website remain available throughout the break.
Application documents
Personal details have been redacted from the application documents.
Fast-track Approvals Act 2024 Substantive Application Form – Tekapo Power Scheme (PDF, 7.2MB)
Assessment of environmental effects (PDF, 3MB)
Appendices
Appendix C: Landowners adjacent to the Tekapo Power Scheme core land (PDF, 417KB)
Appendix D (Updated 25 July 2025): Proposed resource consent conditions (PDF, 410KB)
Appendix D (Superseded): Proposed resource consent conditions (PDF, 389KB)
Appendix E: Draft plans referred to in the proposed consent conditions (PDF, 7.9MB)
Appendix F: Existing environment approach (PDF, 386KB)
Appendix G: Electricity sector benefits 2025 (PDF, 958KB)
Appendix H: Titles and deeds of easements (PDF, 4.6MB)
Appendix J: natural character, landscape and visual amenity effects Assessment 2023 (PDF, 10MB)
Appendix K: Hydrological and hydrogeological analyses 2023 (PDF, 41MB)
Appendix L: Assessment of aquatic environmental effects 2023 (PDF, 3MB)
Appendix M: Native fish assessment 2018 (PDF, 8MB)
Appendix P: Tekapo Herpetofauna Effects Assessment 2023 (PDF, 13MB)
Appendix Q: Assessment of ecological effects – Avifauna 2025 (PDF, 17MB)
Appendix R: Assessment of effects on vegetation 2023 (PDF, 4MB)
Appendix S: Tekapo hydro scheme reconsenting recreation review 2023 (PDF, 2MB)