Reports
9 October 2025
A expert conference was held 2 and 3 October 2025 for the Drury Metropolitan Centre application. At the request of the expert panel in Minute 4, the Fast-track team was provided Joint Witness Statements for the issues raised.
Joint Witness Statement - Stormwater and flooding part 1 (PDF, 3.51MB)
Joint Witness Statement - Stormwater and flooding part 2 (PDF, 21.8MB)
Joint Witness Statement - Transportation (PDF, 7.7MB)
12 September 2025
The panel was provided with advice regarding memoranda from the applicant and Auckland Council relating to banking development capacity.
Advice provided to Drury Metropolitan Centre Expert Panel (PDF, 568KB)
27 May 2025
The Ministry for the Environment provided the Fast-track team with section 18 report on Treaty settlements and other obligations as required under section 49 of the Fast-track Approvals Act 2024.
Treaty settlements and other obligations (section 18) report (PDF, 2.3MB)
Further information provided to the panel
5 September 2025 request 1
The Panel requested further information from the applicant. The information is to be provided by 19 September 2025.
Request 1 for further information from the applicant (PDF, 284KB)
Response from applicant
On the 19 September 2025, the applicant provided a response to the further information request 1.
- Kiwi Property response to RFI request (PDF, 288 KB)
- Attachment 1 - Urban Design Response (PDF, 1 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part1 (PDF, 7 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part2 (PDF, 13 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part3 (PDF, 15 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part4 (PDF, 15 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part5 (PDF, 15 MB)
- Attachment 2 - Revised and Additional Landscape Plans Part6 (PDF, 15 MB)
- Attachment 3 - Updated Proposed Draft Consent Conditions (PDF, 1 MB)
- Attachment 4 - Traffic Response (PDF, 2 MB)
- Attachment 5 - Draft Drury Centre Waste Management Plan (PDF, 212 KB)
- Attachment 6 - Revised Engineering Plans Part1 (PDF, 42 MB)
- Attachment 6 - Revised Engineering Plans Part2 (PDF, 49 MB)
- Attachment 6 - Revised Engineering Plans Part3 (PDF, 37 MB)
- Attachment 7 – Revised Architectural Plans (PDF, 15 MB)
- Attachment 8 - Stormwater Response (PDF, 1 MB)
- Attachment 9 - Site Management Plan prepared by Engeo (PDF, 10 MB)
5 August 2025
The applicant provided a response to the Auckland Council response.
Kiwi Property response including attachment 1 (PDF, 1.4MB)
28 July 2025
Auckland Council suggested further information may be required.
Auckland Council suggestions for further information requests (PDF, 202KB)
24 July 2025
The applicant provided a response to the matters raised in the Auckland Council memorandum dated 23 June 2025.
S67 memorandum response from the applicant (PDF, 3.1MB)
Attachment 1 – maps showing maximum depth plots (PDF, 13.6MB)
Attachment 2 – maps showing water level difference plots (PDF, 18.2MB)
Attachment 3 – Overland flow path assessment (PDF, 3.6MB)
Attachment 4 – Subdivision scheme plans Stage 1 and 2 (PDF, 2.9MB)
Attachment 5 – Proposed draft consent conditions (PDF, 982KB)
Attachment 6 – WFH modelling memo (PDF,1.2MB)
Attachment 7 – Vehicle tracking (PDF, 3.7MB)
Attachment 8 – Engineering drawings part 1 (PDF, 36.5MB)
Attachment 8 – Engineering drawings part 2 (PDF, 39MB)
Attachment 8 – Engineering drawings part 3 (PDF, 39.5MB)
Attachment 8 – Engineering drawings part 4 (PDF, 5.5MB)
Attachment 9 – Landscape drawings (PDF, 5.2MB)
Attachment 10 – Signage review assessment (PDF, 679KB)
Attachment 11 – Architectural drawings part 1 (PDF, 39.5MB)
Attachment 11 – Architectural drawings part 2 (PDF, 14MB)
Attachment 12 – Adaptive management plan (PDF, 518KB)
Attachment 13 – Stream ecological valuation (XLSX, 298KB)
Attachment 14 – Wetland delineation assessment points (PDF, 1MB)
23 June 2025
On 23 June 2025, Auckland Council provided a memorandum covering whether any formal requests for further information or reports under section 67 of the Act are warranted.