Assessment of environmental effects

The assessment of environmental effects shows key project and assessment details required as part of the project application.

Drury Metropolitan Centre Stages 1 and 2 assessment of environmental effects (PDF, 7.5MB)

The following appendices provide supporting detail.

Personal details have been redacted from the application documents.

Appendices

Appendix 1: Application form (PDF, 1.2MB)

Appendix 2: Legal opinion on management plans (PDF,160KB)

Appendix 3: Record of titles and interests (PDF, 2.6MB)

Appendix 4: Owners and occupiers of subject and adjacent land (PDF, 1MB)

Appendix 5: Proposed draft consent conditions (PDF, 1MB)

Appendix 6: Architectural drawings part 1 (PDF, 46.6MB)

Appendix 6: Architectural drawings part 2 (PDF, 48MB)

Appendix 6: Architectural drawings part 3 (PDF, 47MB)

Appendix 6: Architectural drawings part 4 (PDF, 21MB)

Appendix 7: Landscape design report (PDF, 24.4MB)

Appendix 8: Subdivision scheme plans stage 1 and 2 (PDF, 2.7MB)

Appendix 9: Engineering drawings part 1 (PDF, 47.7MB)

Appendix 9: Engineering drawings part 2 (PDF, 39.4MB)

Appendix 9: Engineering drawings part 3 (PDF, 41.6MB)

Appendix 10: Infrastructure report (PDF, 10.4)

Appendix 11: Stormwater report and hazard risk assessment (PDF, 40.3MB)

Appendix 12: Geotechnical investigation report part 1a (PDF, 29.8MB)

Appendix 12: Geotechnical investigation report part 1b (PDF, 29.1MB)

Appendix 12: Geotechnical investigation report part 2 (PDF, 46.3MB)

Appendix 12: Geotechnical investigation report part 3 (PDF, 49MB)

Appendix 12: Geotechnical investigation report part 4 (PDF, 49MB)

Appendix 12: Geotechnical investigation report part 5 (PDF, 48.1MB)

Appendix 12: Geotechnical investigation report part 6 (PDF, 49.1MB)

Appendix 12: Geotechnical investigation report part 7 (PDF, 49.1MB)

Appendix 12: Geotechnical investigation report part 8 (PDF, 24.1MB)

Appendix 13A: Stage 2 remediation action plan (PDF, 26.8MB)

Appendix 13B: Stage 1 contamination summary (PDF, 292KB)

Appendix 13C: Detailed site investigation (PDF, 7.4MB)

Appendix 14: Urban design assessment (PDF, 6.8MB)

Appendix 15: Ecological impact assessment (PDF, 9.3MB)

Appendix 16: Integrated transport assessment and design (PDF, 24.3MB)

Appendix 17: Draft stage 2 travel plan (PDF, 3.9MB)

Appendix 18: Noise and vibration assessment (PDF, 1.3MB)

Appendix 19: Archaeology report (PDF, 10.1)

Appendix 20: Economic impact assessment (PDF, 1.9MB)

Appendix 21: Rules assessment (PDF, 417KB)

Appendix 22: Consultation summary report part 1 (PDF, 42.3KB)

Appendix 22: Consultation summary report part 2.1 (PDF, 44.3KB)

Appendix 22: Consultation summary report part 2.2 (PDF, 48.3KB)

Appendix 22: Consultation summary report part 2.3 (PDF, 24.3KB)

Appendix 23: Section 30 notice (PDF, 133KB)

Appendix 24: Ineligible activity assessment (PDF, 110KB)

Appendix 25A: Construction management plan (PDF, 3.5MB)

Appendix 25B: Operation and management manuals (PDF, 2.8MB)

Appendix 25C: Chemical treatment management plan (PDF, 727KB)

 Appendix 25D: Adaptive management plan (PDF, 450KB)

Appendix 25E: Erosion and sediment control management plan (PDF, 1.4MB)

Appendix 25F: Draft streamworks methodology plan (PDF, 24.5MB)

Appendix 25G: Draft ecological management plan (PDF, 7.8MB)

Appendix 25H: Draft construction noise and vibration management plan (PDF, 750KB)

Appendix 25I: Site management plan (PDF, 4.3MB)

Appendix 25J: Draft construction traffic management plan (PDF, 1.9MB)

Appendix 26: Decision and approved plans for consent BUN60390224 (PDF, 23.4MB)

Appendix 27: Decision for approved plans for consent BUN60414877 part 1 (PDF, 2.3MB)

Appendix 27: Decision for approved plans for consent BUN60414877 part 2 (PDF, 1.9MB)

Appendix 27: Decision for approved plans for consent BUN60414877 part 3 (PDF, 26.5MB)

Appendix 28: Decision and approved plans for LUC60419150 part 1 (PDF, 44MB)

Appendix 28: Decision and approved plans for LUC60419150 part 2 (PDF, 23.8MB)

Appendix 29: Decision and approved plans for LUC60435472 (PDF, 36.7MB)

Appendix 30: Decision and Approved Plans for BUN60423831 part 1 (PDF, 46.8MB)

Appendix 30: Decision and approved plans for BUN60423831 part 2 (PDF, 17.4MB)

Appendix 31: Decision and approved plans for LUC60431681 (PDF, 11.1MB)

Appendix 32: Decision and approved plans for drury station and interchange (PDF, 3.1MB)

Appendix 33: HNZPT authority no. 2022/558 (PDF, 282KB)

Appendix 34: Drury-Opaheke structure plan (PDF, 5.3MB)

Appendix 35: Objectives and policies assessment (PDF, 1.4MB)

Appendix 36: Pre-application meeting minutes for upgrades to Waihoehoe Road (PDF, 237KB)