Application documents
Personal details have been redacted from the application documents.
The Downtown Carpark Redevelopment Substantive Application (PDF, 8.7MB)
Appendices
- Appendix 1 Record of Titles and Interests (PDF, 12 MB)
- Appendix 2 Letter of Support Ngati Whatua Orakei (PDF, 449 KB)
- Appendix 3 Completed Application Form 18 December version (PDF, 3 MB)
- Appendix 4 Ineligible Activity Assessment (PDF, 124 KB)
- Appendix 5 Corporate Statement Scott Pritchard (PDF, 156 KB)
- Appendix 6 Corporate Statement Tim Woods (PDF, 123 KB)
- Appendix 7 Section 30 Notice (PDF, 130 KB)
- Appendix 8 Full Names and Address of Owners and Occupiers of the Site and Adjacent Land 16 December version (PDF, 1 MB)
Architectural drawings
- Appendix 9A Architectural Drawings Part1 (PDF, 49 MB)
- Appendix 9A Architectural Drawings Part2 (PDF, 48 MB)
- Appendix 9A Architectural Drawings Part3 (PDF, 49 MB)
- Appendix 9A Architectural Drawings Part4 (PDF, 46 MB)
- Appendix 9A Architectural Drawings Part5 (PDF, 47 MB)
- Appendix 9A Architectural Drawings Part6 (PDF, 30 MB)
- Appendix 9B Landscape Drawings (PDF, 32 MB)
- Appendix 9C Architecture+Landscape Report Part1 (PDF, 48 MB)
- Appendix 9C Architecture+Landscape Report Part2 (PDF, 48 MB)
- Appendix 9C Architecture+Landscape Report Part3 (PDF, 19 MB)
- Appendix 9E Shading Analysis Part1 (PDF, 48 MB)
- Appendix 9E Shading Analysis Part2 (PDF, 47 MB)
- Appendix 9E Shading Analysis Part3 (PDF, 14 MB)
- Appendix 9D Existing+Demolition Drawings (PDF, 49 MB)
Designs
- Appendix 10 Cultural Design Report (PDF, 15 MB)
- Appendix 11 Urban Design Assessment (PDF, 29 MB)
- Appendix 12 Landscape+Visual Assessment (PDF, 9 MB)
- Appendix 12A Graphic Attachment Part 1 (PDF, 37 MB)
- Appendix 12A Graphic Attachment Part 2 (PDF, 40 MB)
- Appendix 12A Graphic Attachment Part 3 (PDF, 36 MB)
- Appendix 12A Graphic Attachment Part 4 (PDF, 30 MB)
- Appendix 12A Graphic Attachment Part 5 (PDF, 41 MB)
- Appendix 12A Graphic Attachment Part 6 (PDF, 22 MB)
Engineering plans
- Appendix 13 Operational Integrated Transport Assessment (PDF, 21 MB)
- Appendix 14 Draft Construction Management Plan (PDF, 37 MB)
- Appendix 15 Draft Erosion+Sediment Control Management Plan (PDF, 21 MB)
- Appendix 16 Preliminary Detailed Site Investigation (PDF, 19 MB)
- Appendix 17 Draft Contamination Site Management Plan (PDF, 24 MB)
- Appendix 18 Arboricultural Assessment (PDF, 15 MB)
- Appendix 19 Infrastructure Concept Design Report (PDF, 26 MB)
- Appendix 20 Draft Operational Waste Management Plan (PDF, 5 MB)
Consultation reports
Environmental management plans
- Appendix 23 Flood Hazard+Risk Assessment (PDF, 7 MB)
- Appendix 24 Proposed Consent Conditions (PDF, 726 KB)
- Appendix 25 Air Quality Assessment+Draft Dust Management Plan (PDF, 6 MB)
- Appendix 26 Draft Construction Traffic Management Plan (PDF, 1 MB)
- Appendix 27 Draft Construction Noise+Vibration Management Plan (PDF, 1 MB)
- Appendix 28 Environmental Winds Report (PDF, 7 MB)
- Appendix 29 Draft Servicing+Loading Management Plan (PDF, 1 MB)
- Appendix 30 Draft Hotel Pick-Up+Drop-Off Management Plan (PDF, 336 KB)
- Appendix 31 Draft Managed Access Service Arrangement Plan (PDF, 681 KB)
- Appendix 32 Draft Hazardous Substances Management Plan (PDF, 5 MB)
- Appendix 33 Geotechnical+Groundwater Assessment+Draft GSMCP (PDF, 31 MB)
Other reports and assessments
- Appendix 34 Archaeological Assessment (PDF, 5 MB)
- Appendix 35 Draft Archaeological Management Plan (PDF, 559 KB)
- Appendix 36 Economic Impact Assessment (PDF, 1 MB)
- Appendix 37 St Patrick's Square Public Space Audit (PDF, 6 MB)
- Appendix 38 Acoustic Assessment of Effects (PDF, 635 KB)
- Appendix 39 CPTED Assessment (PDF, 5 MB)
- Appendix 40 Demolition+Construction Transport Assessment (PDF, 21 MB)
- Appendix 41 THSA Hotel Advisors Report (PDF, 18 MB)
- Appendix 42 Asbestos Management Plan (PDF, 13 MB)
- Appendix 43 Hazardous Substances Assessment (PDF, 878 KB)
- Appendix 44 Coastal Hazard+Risk Assessment (PDF, 2 MB)
- Appendix 45 City Centre Objectives and Policies Assessment (PDF, 337 KB)
- Appendix 46 Landslide Hazard Risk Assessment (PDF, 4 MB)
Additional documents provided by the applicant
7 April 2026
On 7 April 2026 the applicant provide the Panel with an updated position on the outstanding issues between Precinct and the key stakeholders.
The Appendices to their memorandum are addendum reports addressing the updated position on the following matters:
Planning
Economics
Urban Design
Noise and Vibration
Traffic
Architecture and Landscape
Geotechnical and Groundwater
Flooding and Coastal Inundation
Erosion and Sediment Control Plan
Hazardous Substances
- Downtown-Carpark-Memorandum-of-Counsel-7.4.26.pdf (PDF, 318 KB)
- Appendix 1 Downtown Carpark Site Development FTAA - Planning Addendum 7 April 2026 FINAL (PDF, 1 MB)
- Appendix 2 Downtown Carpark EIA Economic Addendum (PDF, 216 KB)
- Appendix 3MUL UrbanDesignMemo#15 (PDF, 831 KB)
- Appendix 4 Acoustic Assessment Addendum (PDF, 327 KB)
- Appendix 5 FTAA Transport Responses (PDF, 11 MB)
- Appendix 6 FTA S67 responses (PDF, 2 MB)
- Appendix 7 T+T Geotechnical Addendum Report - Rev1 (PDF, 7 MB)
- Addendum 8 7 April 2026-Coastal and Flood addendum cover letter (PDF, 485 KB)
- Appendix 9 TT-ESCP Addendum.v1 (PDF, 2 MB)
- Appendix 10 TT-Hazardous Substances Addendum.v1 (PDF, 8 MB)