Updated application documents
On 31 August 2026, the applicant provided additional updated application documents in response to a further information request.
- Parkburn Subdivision RFI Response (PDF, 275 KB)
- Parkburn Substantive Application – Planning Report (updated 31 August 2026) (PDF, 2 MB)
- Parkburn Substantive Application – Planning Report (updated 31 August 2026) (DOCX, 27 MB)
- Parkburn Substantive Application – Planning Report (updated 31 August 2026) (tracked changes version) (DOCX, 27 MB)
- Attachment J (E) – Adjacent Landowners and Occupiers Plan (PDF, 622 KB)
- Attachment J (F) – Adjacent Landowners and Occupiers Details Table (PDF, 133 KB)
- Attachment NN – Final CIA and Attachment 2 (PDF, 10 MB)
- Attachment OO – Indicative SW pipe corridor at marginal strip (PDF, 1 MB)
- Attachment PP – Indicative Cross Section Parkburn Bridge Abutments and GPS Map Coordinates (PDF, 149 KB)
- Attachment QQ – DOC Concession Easement Form – Stormwater Pipe and Corridor (PDF, 405 KB)
- Attachment RR – DOC Concession Easement Form – Bridge Approach (PDF, 411 KB)
- Attachment SS – Declaration of criminal convictions (PDF, 264 KB)
Application documents
Personal details have been redacted from the application documents.
Attachment C – Proposed Conditions of Consent
- Attachment D – FTAA Section 30 Letter – Otago Regional Council (PDF, 194 KB)
- Attachment E – FHLD Enforcement Declaration (PDF, 119 KB)
- Attachment F – FHLD Fast-track TPG Authorisation (PDF, 276 KB)
- Attachment G – Ineligible Activities Assessment under the FTAA (PDF, 120 KB)
- Attachment H – Ecological Assessment – Viridis Environmental Consultants (PDF, 17 MB)
- Attachment I – Records of Title (PDF, 1022 KB)
Attachment J – Consultation Record Summary
- Attachment J (A) – LINZ Meeting Notes (3 June 2026) (PDF, 181 KB)
- Attachment J (B) – Email correspondence with NZTA (PDF, 508 KB)
- Attachment J (C) – DOC meeting notes (15 June 2026) (PDF, 170 KB)
- Attachment J (D) – Adjoining Landowners Letter (PDF, 26 MB)
- SUPERSEDED – Attachment J (E) – Map of Adjacent Owners (PDF, 610 KB)
- Attachment K – Stormwater Management Plan – Woods and FlowState (PDF, 22 MB)
- Attachment L – Preliminary and Detailed Site Investigation – Insight Engineering (PDF, 30 MB)
- Attachment M – Remedial Action Plan – Insight Engineering (PDF, 13 MB)
- Attachment N – Transportation Assessment – Carriageway Consulting (PDF, 5 MB)
Attachment O – Development Plans
- Attachment O (1) – Parkburn Masterplan (July 2026) (PDF, 14 MB)
- Attachment O (2) – Parkburn Scheme Issued For Consent (PDF, 14 MB)
- Attachment O (3) – Parkburn Development Plan (PDF, 9 MB)
- Attachment O (4) – Parkburn Open Spaces (PDF, 1 MB)
- Attachment O (5) – Parkburn Lizard Relocation (PDF, 6 MB)
- Attachment O (6) – Parkburn Outline Development (PDF, 4 MB)
- Attachment O (7) – Parkburn Staging (PDF, 8 MB)
- Attachment O (8) –Parkburn Roading Typology (PDF, 1 MB)
- Attachment O (9) – Parkburn Crown Land Works (PDF, 29 MB)
- Attachment O (10) – Parkburn Acoustic Bunds (PDF, 3 MB)
- Attachment O (11) – Parkburn Stormwater Catchments (PDF, 10 MB)
- Attachment O (12) – Parkburn Intersection Plan (PDF, 5 MB)
- Attachment O (13) – Parkburn Existing Site Contours (PDF, 18 MB)
- Attachment O (14) – Parkburn Design Contours (PDF, 4 MB)
- Attachment O (15) – Parkburn Bulk Earthworks Staging – Methodology Overview (PDF, 12 MB)
- Attachment O (16) – Parkburn Erosion and Sediment Control – Parts 1–3 (PDF, 28 MB)
- Attachment O (16) – Parkburn Erosion and Sediment Control – Parts 4–7 (PDF, 28 MB)
- Attachment O (17) – Parkburn Slope Analysis (PDF, 6 MB)
- Attachment O (18) – Parkburn SH6 Services (PDF, 587 KB)
- Attachment O (19) – Parkburn Cove Cross Section (PDF, 1 MB)
- Attachment O (20) – Parkburn Carpark Boat Ramp (PDF, 5 MB)
- Attachment O (21) – Parkburn Bridge Concept Design Plans (PDF, 353 KB)
- Attachment O (22) – Parkburn Properties Within 80m of SH6 (PDF, 531 KB)
Attachment P – Environmental Management Plan
- Attachment Q – Landscape and Visual Assessment – Landscape with Linda and Reset (PDF, 17 MB)
- Attachment R – Landscape Concept – Landscape With Linda (PDF, 8 MB)
- Attachment S – Urban Design Assessment – Reset (PDF, 1 MB)
- Attachment T – Crown Land Works Plans (PDF, 29 MB)
- Attachment U (A) – CODC Rules Assessment (PDF, 188 KB)
- Attachment U (B) – ORC Rules Assessment (PDF, 140 KB)
- Attachment V – Economic Assessment Peer Review – Benji Patterson (PDF, 449 KB)
- Attachment W – Contamination Report Peer Review – WSP (PDF, 524 KB)
- Attachment X – Geotechnical Report – Insight Engineering (PDF, 11 MB)
- Attachment Y – Geotechnical Report Peer Review – WSP (PDF, 289 KB)
- Attachment Z – Letter Response to Geotechnical Peer Review – Insight Engineering (PDF, 541 KB)
- Attachment AA – SMP Peer Review – Stantec (PDF, 135 KB)
- Attachment BB – SMP Peer Review – CODC/Mott MacDonald (PDF, 333 KB)
- Attachment CC – EMP Peer Review – Stantec (PDF, 499 KB)
- Attachment DD – Hydrology Assessment – Environmental Associates (PDF, 763 KB)
- Attachment EE – Peer Review of Hydrology Report – ORC (PDF, 175 KB)
- Attachment FF – Letter Response to ORC Hydrology Report Review – Environmental Associates (PDF, 154 KB)
- Attachment GG – Ecology Report Peer Review – Terrestrial – Wildlands (PDF, 369 KB)
- Attachment HH – Ecology Report Peer Review – Freshwater – Andrew Rossark (Morphum) (PDF, 108 KB)
- Attachment II – Landscape and Urban Design Assessment Peer Review – CODC on behalf of Boffa Miskell (PDF, 676 KB)
- Attachment JJ – Transport Assessment Peer Review – Avanzar Consulting (PDF, 1 MB)
- Attachment KK – Noise Assessment – Marshall Day Acoustics (PDF, 1 MB)
Attachment LL – Infrastructure Report
- Attachment LL (Part 1) – Parkburn Infrastructure Report (PDF, 999 KB)
- Attachment LL (Part 2) – Parkburn Infrastructure Report (PDF, 11 MB)
- Attachment LL (Part 3) – Parkburn Infrastructure Report (PDF, 41 MB)
- Attachment LL (Part 4) – Parkburn Infrastructure Report (PDF, 29 MB)
- Attachment LL (Part 5) – Parkburn Infrastructure Report (PDF, 1 MB)
- Attachment LL (Part 6) – Parkburn Infrastructure Report (PDF, 4 MB)
- Attachment LL (Part 7) – Parkburn Infrastructure Report (PDF, 5 MB)
- Attachment LL (Part 8) – Parkburn Infrastructure Report (PDF, 38 MB)
- Attachment LL (Part 9) – Parkburn Infrastructure Report (PDF, 208 KB)
- Attachment LL (Part 10) – Parkburn Infrastructure Report (PDF, 48 MB)
- Attachment LL (Part 11) – Parkburn Infrastructure Report (PDF, 49 MB)
- Attachment LL (Part 12) – Parkburn Infrastructure Report (PDF, 2 MB)
- Attachment LL (Part 13) – Parkburn Infrastructure Report (PDF, 12 MB)
- Attachment LL (Part 14) – Parkburn Infrastructure Report (PDF, 13 MB)
- Attachment LL (Part 15) – Parkburn Infrastructure Report (PDF, 26 MB)
- Attachment MM – Letter confirming no convictions or pending convictions under Wildlife Act (PDF, 177 KB)